B&O Trail

County: 
Hendricks, Marion
City: 
Brownsburg, Clermont, Indianapolis

 

Descriptions: 

 Now, Kroger shoppers can support B&O Trail!!!

Development of the B & O Trail segment in Marion and Hendricks Counties has ramped up. After 16 or more years of negotiations with the CSX Rail Road, the purchase of 16miles of the B & O wrapped up in December, 2009.

May 11, 2010 witnessed groundbreaking ceremonies for the paving of three miles of the B & O from State Road 267 in Brownsburg, just north of County Road 350 North. The construction resulted from fundraising and trail design going on during the time of the purchase negotiations.

The new trail construction will also include building a bridge across the east fork of White Lick Creek, almost ½ mile south of the O’Reilly Raceway Park, formerly known as Raceway Park. The wooded area, bounded on either side by federally protected wetland will make a scenic promenade.

This three mile paving of the B & O eastward from State Road 267 in Brownsburg will end at County Road 300 North. Due to a gap in land ownership, trail goers will have to follow a mile long detour along 300 North eastward to County Road 1000, and then south one third mile until they link up with the B & O again and continue eastward on the trail the “end of the line” of pavement, at Raceway Road (County Line Road).

A green light atop a railroad semaphore marks the trail here, a former signal signifying “clear travel” to railroad engineers riding their magic carpet of steel. A similar semaphore will decorate the new trail head at State Road 267.

Across Raceway Road, or County Line Road, the unpaved part of the B & O continues eastward and through grass, but still accessible by foot, for about 1000 feet, unpaved, across Tansel Road through grassy fields in the Drakes Landing, a housing addition.
INFO
Type of Trail: 
Rail-trail
Mileage: 
3.1
Part NOT open: 
yes
Total Length of all segments: 
future 50-60 miles
Surface: 
pavemennt when open
Uses allowed: 
pedestrians, bicyclists, equestrains.
Wheelchairs allowed: 
Yes
Attractive Features: 
In the future: Will connect to Eagle Creek Trail, which connects to National Heritage trail, Montezuma a major port, end stops on Wabash &Erie canal, longest canal built in US.
West Endpoint – General: 
SR267
East endpoint – General: 
Raceway Rd(County Line)
Notable Trailhead: 
Other Trailheads at Rustic trail segments are at SR267, SR75 near North Salem
Near to US highways: 
I-465 &I-74(exit 16) take I-74 eastward about 1/3mile to first stop light, which is US136, Crawfordsville Road. Take US136 south and curve westward about 4miles to the stop-lighted intersection, at Clermont, with Raceway Road. Turn left/south. Go about a 1.5mile to rise in road, which is the B&O. Park on grass, off of road. Walk on layer of rough asphalt.
Lat. of Major TrailHead: 
39.814997 39N 48' 54"
Long. Of Major TrailHead: 
-86.326790 86W 19' 36.444"
Agency, Group Owned: 
B&O Trail Association
Manager: 
Diana Virgil
Address: 
6038 Walnut Court – Brownsburg, IN – 46112
Telephone: 
317-852-3838
E-mail: 
botrail@earthlink.net
Website: 

Deven Lindenberg Explains the First Three Phases of the B&O Trail Planning and Construction

Every project needs a first step and a plan for completion. For the B & O Rail Company that first step was in 1827 when the port of Baltimore, Maryland decided to construct a rail line westward to compete with the Erie Canal waterway for commercial and economic development of the East Coast. Through acquisitions and mergers in the ensuing 150 years, that rail line, named the Baltimore and Ohio, would extend more than a 1000 miles west to St. Louis via Cincinnati, Ohio; and Chicago via Pittsburgh, Pennsylvania. A merger of the 1880 Indianapolis, Decatur, and Springfield (Illinois) Railroad with the B & O Railroad in 1927 brought Indianapolis into the B & O system, making the connection just north of Cincinnati, Ohio. 

The B & O Railroad is one of the oldest rail road companies in the United States, and the first in the country to carry commercial goods. Today, active former B & O rail corridors are in the CSX rail network. Because of a decline in rail freight after WWII the 75-mile section of the line running west from Indianapolis to Montezuma, Indiana, a town less than 10 miles from the Illinois-Indiana State line, was abandoned in the years 1989 to 1993.

That abandonment though, was the first step in the vision of Diana and Hall Virgil, energetic bicycle and rail trail advocates, to repurpose the rail corridor into a pedestrian and bicycle transportation and recreation trail. Just a year later, Hendricks County Trail Development, Inc. (HCTDA) joined with the future B & O Trail Association, Inc. (BOTA) to develop the trail. Funding and legal issues delayed the actual construction of the trail for several years.

But that’s where the plan comes into play. Or rather two plans. Beverly Katterhenry of the Speedway Trails Association, Inc. is developing the eastern section of the abandoned B & O rail corridor beginning at the Marion-Hendricks County line at Raceway Road and running east through Speedway, Indiana. She is developing her rail-trail plan in concert with the redevelopment of Main Street in downtown Speedway.

Diana Virgil and the B & O Trail Association’s Plan begins at the same county line but runs westerly into Hendricks County. Storrow Kinsella & Associates (SKA), an Indianapolis Landscape Architecture and Planning firm was hired to design and complete construction drawings for the trail, and in particular, Phase One. In this video, SKA Project Manager Deven Lindenberg, explains the importance of design details in the first phase of the project. “Getting it right” in the design of site furnishings including paving materials, signage, and logos, even choice of font, size and color sets the feel, character and experience of trail users from the beginning of the project throughout all of its construction phases. And while every trail has typical trail features such as benches and signs, each one also offers the designer a unique set of challenges. They include addressing universal access for people with disabilities (ADA) and other safety, transportation and environmental issues. Deven describes a unique safety feature designed and included in the site furnishings along this suburban (not urban or rural) trail.

Although the first step of this rail trail was only 1,000 feet, Phase Two, finished in 2011 extended the trail westward three more miles. Another two miles, with expected funding in 2013-2014 will be constructed in Phase Three, running west from State Road 267. Although it has been almost twenty years the steps taken by BOTA together with the plan by SKA will ensure the functional use of this corridor to continue well into the next century.

Article by Tina jones

 

Diana and Hall Virgil: The B&O trail

Explanation: 

Interview with the founders of the B&O trail

Time Length: 
15.00 minutes
Location: 
Brownsburg, Indiana.
Year/Month: 

2010